Menu:

.:Quick Contact:.

Inland Valley Engineering, Inc.

Mailing Address:
27475 Ynez Rd. #627
Temecula, CA 92591

Office: 951-303-8309
Office: 951-303-8375
Fax: 951-303-6444
arrow More Contact Options
arrow Feature Articles

Inland Valley Engineering will bring integrity, precision and quality to your work site. We strive to build strong relationships with our clients and perform quality underground utility placement. We won't stop until your utilities are safe, secure and fully operational. We take pride in what we do and it shows in our service.

 

Drilling

Sewer Pipe Installation.

Drill from the corner.


Our Services
Past Customers and Jobs Completed:

University of California, San Diego, Scripps Marine Biology Institution/Birch Aquarium.
arrow Job: Installation of 8”, 10” and 12” grade seawater return lines by Pit Launched Directional Drill method. Installation of 3” Fiber Optic conduit by Pit Launched Directional Drill method.
arrow Featured in June 2007 edition of Underground Construction Magazine

Cornerstone Environmental Contractors, Inc.
arrow Job #1: George Air Force Base Installation of 3” and 4” electrical conduit under taxi ways by HDD method.
arrow Job #2: El Toro M.C.A.S. Marine Base Installation of 5” electrical conduit under taxi ways by HDD method.

Stevens Construction, Inc.
arrow Job #1: Palmdale Airport / AFB 42, Lancaster, CA Installation of 2” galvanized conduit for lighting under taxi ways.
arrow Job #2: Hwy. 58 Rest Stop / Cal Trans, Boron, CA Installation of 6” grade sewer by Pit Launched HDD method. Installation of 3” pressure sewer under Hwy. 58 by HDD method.

Watermill Express, LLC
arrow Job: Private Shopping Mall, Riverside, CA Installation of 2” and 3” conduit for telecom, electric, sewer and water by HDD method.

Prime Time Construction, Inc.
arrow Job: D. R. Horton Homes, Heber, CA Installation of 48” steel casing by Jack & Bore method.

Bycor General Contractors
arrow Job: NTC Marine Core Base Historic Restoration Project, City of San Diego Installation of 2”, 4”, 6”, 8” and 10” conduit for power, sewer and water by Pit Launched HDD method. Custom bores coring concrete footings and boring under parking lots to install pipe.

Jay Fletcher Creamer and Son, Inc.
arrow Job: Eastern Municipal Water District, Perris, CA Installation of 1,000 feet of 24” water transmission main by HDD method.

El Cajon Grading & Engineering Company, Inc.
arrow Job: Sweetwater Authority, Chula Vista, CA Installation of 24” steel casing by Jack & Bore method.

IPS Plumbing
arrow Job: Dos Pueblos High School, Goleta, CA Installation of 127 feet of 8” sewer pipe by Pit Launched HDD method.

Portrait Homes, Inc.
arrow Job: Cypress Springs Apts., Janet Street, Riverside, CA Installation of 1” PVC pipe for five, 10’ – 25’, driveway crossings by Push Mole method.