George Air Force Base Installation of 3” and 4” electrical conduit under taxiways by HDD method.
Job #2:
El Toro M.C.A.S. Marine Base Installation of 5” electrical conduit under taxiways by HDD method.
Stevens Construction, Inc.
Job #1:
Palmdale Airport / AFB 42, Lancaster, CA Installation of 2” galvanized conduit for lighting under taxi ways.
Job #2:
Hwy. 58 Rest Stop / Cal Trans, Boron, CA Installation of 6” grade sewer by Pit Launched HDD method. Installation of 3” pressure sewer under Hwy. 58 by HDD method.
Watermill Express, LLC
Job:
Private Shopping Mall, Riverside, CA Installation of 2” and 3” conduit for telecom, electric, sewer and water by HDD method.
Prime Time Construction, Inc.
Job:
D. R. Horton Homes, Heber, CA Installation of 48” steel casing by Jack & Bore method.
Bycor General Contractors
Job:
NTC Marine Core Base Historic Restoration Project, City of San Diego Installation of 2”, 4”, 6”, 8” and 10” conduit for power, sewer and water by Pit Launched HDD method. Custom bores coring concrete footings and boring under parking lots to install pipe.
Jay Fletcher Creamer and Son, Inc.
Job:
Eastern Municipal Water District, Perris, CA Installation of 1,000 feet of 24” water transmission main by HDD method.
El Cajon Grading & Engineering Company, Inc.
Job:
Sweetwater Authority, Chula Vista, CA Installation of 24” steel casing by Jack & Bore method.
IPS Plumbing
Job:
Dos Pueblos High School, Goleta, CA Installation of 127 feet of 8” sewer pipe by Pit Launched HDD method.
Portrait Homes, Inc.
Job:
Cypress Springs Apts., Janet Street, Riverside, CA Installation of 1” PVC pipe for five, 10’ – 25’, driveway crossings by Push Mole method.